Everett - Paris St. Sewer Separation

Paris Street Sewer Separation: Furnish labor, materials and equipment necessary for disconnection of catch basins from sewer system, installation of drain pipe, drain manholes, catch basins, and connections to existing drainage system; furnish labor, materials and equipment necessary for sewer manholes, sewer pipe, water main; removal of sewer main, sewer structures, drainage structures. The general characteristics, locations and details of the work to be performed under this contract are specified in the contract specifications and drawings provided herein.

Status

Bidding Closed

Bid Date 1/5/23 11:00am

Company & Contacts

BETA Group, Inc.
Andrew Joseph Dennehy  
508-816-4541

Location

Everett, MA

= BID DATES =

All Bids Due on 01/05/23 at 11:00 AM.


= PURCHASE & SHIPPING INFO =

For Printed Sets, NON-REFUNDABLE checks should be made out to Accent Printing.

Complete sets only.

Printed sets can be picked up at Accent Printing, 99 Chelmsford Road, (Rear #13) No. Billerica 01862 after an order is placed. (8:00 – 4:30 M-F)

Shipping via UPS is additional.