Uxbridge - Sutton Street Culvert Replacement, Contract No. 2020-18

Required for the replacement of the Sutton Street Culvert, and the reconstruction of the roadway. The work includes removing the existing twin 32” corrugated metal pipes (CMP) and replacing it with new twin 48" RCP pipes, cast-in-place concrete wingwalls and headwalls, riprap, control of water, excavation, milling and resurfacing, geometric improvements, stream and wetland restoration and replication, installation of guardrail, signing, pavement markings and the provision of safety controls and signing for construction operations and other incidental items included in the contract documents necessary to complete the Project.
Specs (click to expand/collapse)