Manchester - NH - Sheffield Road Sewer Forcemain & Pump Station Upgrade

The project consists of the installation of roughly 1,700 linear feet of 6-inch HDPE forcemain and associated paving; select demolition of the existing Sheffield Road Pump Station interior piping and pumps; installation of new roof and architectural upgrades; fence and gate installation; electrical and controls; and repair and coating of existing wetwell. The project also consists of select demolition of the existing South Mammoth Pump Station electrical, installation of a new generator, and associated controls.
Addendums (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 1 1.1 MB
Addendum 2 108.3 KB