Tewksbury - (PW-25-04) ANDOVER ST. AT AMES POND DR. TRAFFIC SIGNAL IMPROVEMENTS PROJECT

Replacement of the existing malfunction management units (mmu), installation of a controller in the existing controller cabinet, updates to signal timing, updates to signal phasing, installation of new 3-section signal heads and 4-section signal heads on existing mast arms, new pedestrian signal heads and pushbuttons on a new post, and the installation of ramps at the crosswalk with detectable warning panels that are in accordance with MassDOT construction specifications, , and all else necessary for the successful completion of the work.